The two preparation halls are used not only for the setup and dismantling of the measuring equipment (usually done by Rail Tec Arsenal), but also for retrofitting and optimi-sation work to be performed by our clients‘ technicians. The halls are secured by a separate access control system, which allows any of the two preparation halls to be made available exclusively to a specific customer, if required. Each preparation hall al-so houses an office room with telephone and PC with Internet access, a locker room and separate sanitary facilities.


Print