The two preparation halls are used not only for the setup and dismantling of the measuring equipment (usually done by Rail Tec Arsenal), but also for retrofitting and optimisation work to be performed by our clients‘ technicians. The halls are secured by a separate access control system, which allows any of the two preparation halls to be made available exclusively to a specific customer, if required. Each preparation hall also houses an office room with telephone and PC with Internet access, a locker room and separate sanitary facilities.


Print